Traffic Control Plan Information

Traffic Control Plan Required Information
  • Must clearly depict the planned excavation area.
  • Must clearly show the routing of traffic, both vehicular and pedestrian, around the work zone and if a detour is required it must show the entire planned route.
  • Must show all placement of safety signs and traffic cones to be used within the work zone. All traffic control devices should follow the MUTCD Standards of Temporary Traffic Control Devices.
  • All affected ADA crossings need to be maintained or rerouted to appropriate ADA access.
  • Maine MDOT Road Classification Map